Back to Search Results << 1 of 1 >>

Dearing Ford Business and Industrial Park 
Tardy Mountain Road and Dearing Ford Road
Altavista, VA 24517
Driving Directions
Contact:
John Loftus
Virginia Economic Development Partnership
804-545-5786
jloftus@yesvirginia.org

Property Map Photos/Files   Additional Research
Community Profile:  Campbell| Region 2000 |Lynchburg MSA

Site Specifications
Site Area (acres) 55.00 Largest Contiguous Parcel (acres) 30.00
Subdividable Yes
Zoning Heavy Industrial
Topography Gently rolling; 100% cleared
Right Now Certified (Shovel Ready) Yes

Utilities
Electric Provider Southside Electric Cooperative
Natural Gas Provider Columbia Gas of Virginia
Water Provider Campbell County Utilities & Service Authority
Sewer Provider Campbell County Utilities & Service Authority
Telecommunications Provider CenturyLink
Broadband Speed Level NA

Transportation
Interstate / Distance I-81, / 75.0 miles
4-Lane arterial Highway / Distance U.S. Route 29 / 0.5 miles
Commercial Airport / Distance Lynchburg Regional Airport / 20.0 miles
General Aviation Airport / Distance Lynchburg Regional Airport / 20.0 miles
Rail Provider NA

Labor Statistics *
Total Population: 446,051 Total Civilian Labor Force: 213,270
Unemployment Rate: 6.13% Prevailing Wage-Hour/Annual: $19.28/ $40,099

Seaport Info
Port of Richmond 2 hour 17 minutes / 127.3 miles
Port of Virginia (Inland Port Front Royal) 2 hour 54 minutes / 183.3 miles
Port of Virginia (Newport News Marine Terminals) 3 hour 25 minutes / 207.8 miles
Port of Virginia (Norfolk International Terminals) 3 hour 35 minutes / 217.7 miles
Port of Virginia (APM Terminals Virginia) 3 hour 39 minutes / 220.1 miles

Other Port of Entry Info
Port of Washington - Dulles 3 hour 26 minutes / 190.5 miles

Comments
Telecom fiber plans: Build fiber to park and coil in handhole.
Phase 1 pad sites graded: 6A - 10,000 sq. ft.; 6B - 30,000 sq. ft.; and 6C - 50,000 sq. ft.
Water has over 1 mgd residual capacity. Sewer has over 1.8 mgd residual capacity.
The park is designated as a Mid-Atlantic Broadband GigaPark. GigaParks offer access to multiple telecom and optical service providers through Mid-Atlantic Broadband Cooperative.
Southside Electric Cooperative Sub-station approximately 1/4 mile away with 20 MW available capacity.


* Population (2012) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Mar 2013) are based on the locality plus the extended labor market area. Prevailing wage is 3rd quarter 2012 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality.

This information has been secured from sources we believe to be reliable, but we make no representation or warranties, expressed or implied, as to the accuracy of the information.

 Back to Search Results << 1 of 1 >>