| |
|
|
|
| Site Area (acres) |
55.00 |
Largest Contiguous Parcel (acres) |
30.00 |
| Subdividable |
Yes
|
| Zoning |
Heavy Industrial |
| Topography |
Gently rolling; 100% cleared |
| Right Now Certified (Shovel Ready) |
Yes |
|
| Electric Provider |
Southside Electric Cooperative |
| Natural Gas Provider |
Columbia Gas of Virginia |
| Water Provider |
Campbell County Utilities & Service Authority |
| Sewer Provider |
Campbell County Utilities & Service Authority |
| Telecommunications Provider |
CenturyLink |
| Broadband Speed Level |
NA
|
|
| Interstate / Distance |
I-81, /
75.0 miles |
| 4-Lane arterial Highway / Distance |
U.S. Route 29 /
0.5 miles |
| Commercial Airport / Distance |
Lynchburg Regional Airport /
20.0 miles |
| General Aviation Airport / Distance |
Lynchburg Regional Airport /
20.0 miles |
| Rail Provider |
NA
|
|
|
Total Population:
|
446,051 |
Total Civilian Labor Force:
|
213,270 |
|
Unemployment Rate:
|
6.13% |
Prevailing Wage-Hour/Annual:
|
$19.28/
$40,099 |
|
| Port of Richmond |
2 hour 17 minutes /
127.3 miles
|
| Port of Virginia (Inland Port Front Royal) |
2 hour 54 minutes /
183.3 miles
|
| Port of Virginia (Newport News Marine Terminals) |
3 hour 25 minutes /
207.8 miles
|
| Port of Virginia (Norfolk International Terminals) |
3 hour 35 minutes /
217.7 miles
|
| Port of Virginia (APM Terminals Virginia) |
3 hour 39 minutes /
220.1 miles
|
|
| Port of Washington - Dulles |
3 hour 26 minutes /
190.5 miles
|
|
| Telecom fiber plans: Build fiber to park and coil in handhole. |
| Phase 1 pad sites graded: 6A - 10,000 sq. ft.; 6B - 30,000 sq. ft.; and 6C - 50,000 sq. ft. |
| Water has over 1 mgd residual capacity. Sewer has over 1.8 mgd residual capacity. |
| The park is designated as a Mid-Atlantic Broadband GigaPark. GigaParks offer access to multiple telecom and optical service providers through Mid-Atlantic Broadband Cooperative. |
| Southside Electric Cooperative Sub-station approximately 1/4 mile away with 20 MW available capacity. |
|
| * Population (2012) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Mar 2013) are based on the locality plus the extended labor market area. Prevailing wage is 3rd quarter 2012 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality. |
|
|
|
This information has been secured from sources we believe to be reliable, but we
make no representation or warranties, expressed or implied, as to the accuracy
of the information.
|