| Site Area (acres) |
53.00 |
Largest Contiguous Parcel (acres) |
27.31 |
| Subdividable |
Yes
|
| Zoning |
I-H, Industrial-Heavy |
| Topography |
Gently Rolling |
|
| Electric Provider |
Dominion Virginia Power |
| Natural Gas Provider |
Not Available |
| Water Provider |
Campbell County Utilities & Service Authority |
| Sewer Provider |
On site septic |
| Telecommunications Provider |
CenturyLink |
| Broadband Speed Level |
NA
|
|
| Interstate / Distance |
I-81, /
56.0 miles |
| 4-Lane arterial Highway / Distance |
Wards Road; US Rt 29 /
0.0 miles |
| Commercial Airport / Distance |
Lynchburg Regional Airport /
12.0 miles |
| General Aviation Airport / Distance |
Lynchburg Regional Airport /
12.0 miles |
| Rail Provider |
NA
|
|
|
Total Population:
|
430,452 |
Total Labor Force:
|
213,828 |
|
Unemployment Rate:
|
8.98% |
Prevailing Wage-Hour/Annual:
|
$15.06/
$31,332 |
|
| Port of Richmond |
2 hour 6 minutes /
116.2 miles
|
| Port of Virginia (Inland Port Front Royal) |
2 hour 43 minutes /
171.6 miles
|
| Port of Virginia (Newport News Marine Terminals) |
3 hour 14 minutes /
195.9 miles
|
| Port of Virginia (Norfolk International Terminals) |
3 hour 24 minutes /
205.6 miles
|
| APM Terminal - Portsmouth |
3 hour 27 minutes /
208.4 miles
|
| Port of Virginia (Portsmouth Marine Terminal) |
3 hour 30 minutes /
211.0 miles
|
|
| Port of Washington - Dulles |
3 hour 14 minutes /
177.5 miles
|
|
| Per acre land costs can be negotiated on a case by case basis, utilizing incentives to offset the cost of the land. |
| Build to suit is an option based upon clients financial condition and project parameters. |
| Sites will not be sold for speculative purposes, project construction must be under way within 12 month period. |
| Lots have not been subdivided and recorded. A masterplan is complete that shows one development scheme. |
| The park is served by both Dominion Virginia Power and Appalachian Power. The first lots on either side of Ewing Drive are in Dominion's area, the next lots are split between Dominion and Appalachian and everything beyond that is in Appalachian's area. |
| Mid-Atlantic Broadband Cooperative has fiber into the park. |
| We can deviate from the masterplan and create different size lots to meet the clients needs |
|
| * Population (2009) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Jul 2010) are based on the locality plus the extended labor market area. Prevailing wage is 4th quarter 2009 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality. |
|
|
|
This information has been secured from sources we believe to be reliable, but we
make no representation or warranties, expressed or implied, as to the accuracy
of the information.
|