|
|
|
|
| Site Area (acres) |
515.00 |
Largest Contiguous Parcel (acres) |
114.00 |
| Subdividable |
Yes
|
| Zoning |
Planned Industrial |
| Topography |
typical slopes of 2% - 25% |
| Technology Zone |
Yes |
|
| Electric Provider |
Southside Electric Cooperative |
| Natural Gas Provider |
Columbia Gas of Virginia |
| Water Provider |
Bedford County Service Authority |
| Sewer Provider |
Bedford County Service Authority |
| Telecommunications Provider |
Verizon |
| Broadband Speed Level |
NA
|
|
| Interstate / Distance |
I-81, /
50.0 miles |
| 4-Lane arterial Highway / Distance |
US 460 Lynchburg-Salem Tnpk /
0.0 miles |
| Commercial Airport / Distance |
Lynchburg Regional Airport /
10.0 miles |
| General Aviation Airport / Distance |
New London Airport /
3.0 miles |
| Rail Provider |
NA
|
|
|
Total Population:
|
593,773 |
Total Labor Force:
|
306,467 |
|
Unemployment Rate:
|
8.17% |
Prevailing Wage-Hour/Annual:
|
$14.86/
$30,902 |
|
| Port of Richmond |
2 hour 9 minutes /
122.9 miles
|
| Port of Virginia (Inland Port Front Royal) |
2 hour 41 minutes /
172.4 miles
|
| Port of Virginia (Newport News Marine Terminals) |
3 hour 17 minutes /
202.5 miles
|
| Port of Virginia (Norfolk International Terminals) |
3 hour 26 minutes /
212.2 miles
|
| APM Terminal - Portsmouth |
3 hour 30 minutes /
215.0 miles
|
| Port of Virginia (Portsmouth Marine Terminal) |
3 hour 33 minutes /
217.7 miles
|
|
| New River Valley Airport (Virginia TradePort) |
1 hour 32 minutes /
95.4 miles
|
| Port of Washington - Dulles |
3 hour 12 minutes /
178.3 miles
|
|
| Center for Advanced Engineering and Research (CAER) has selected the park for its research/educational facility, scheduled to open in 2010. |
| System capacity at the Lynchburg water plant is 13 mgd. Fire flow availability is 1,000 gpm within the park. Available capacity is 1+ mgd. Sewer system capacity is 350 gpm (limited by pump station). Available capacity is 300 gpm. |
| Telecom fiber in place at entrance to park provided by Mid-Atlantic Broadband. Ductbank in place throughout open section of park. Other providers having fiber in place are Verizon and N'telos. |
| Million gallon water storage tank in service. |
| DEQ permit secured for creek and stream crossings and stormwater. Conservation easements in place. |
| Park is wooded, walking trails and aesthetically pleasing appearance will prevail. |
|
| * Population (2009) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Jul 2010) are based on the locality plus the extended labor market area. Prevailing wage is 4th quarter 2009 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality. |
|
|
|
This information has been secured from sources we believe to be reliable, but we
make no representation or warranties, expressed or implied, as to the accuracy
of the information.
|