| Site Area (acres) |
772.95 |
Largest Contiguous Parcel (acres) |
260.00 |
| Subdividable |
Yes
|
| Zoning |
Industrial |
| Topography |
Gently rolling; cleared |
| Enterprise Zone |
Yes |
| Hub Zone |
Yes |
| Right Now Certified (Shovel Ready) |
Yes |
|
| Electric Provider |
Dominion Virginia Power |
| Natural Gas Provider |
Not Available |
| Water Provider |
Town of Keysville |
| Sewer Provider |
Town of Keysville |
| Telecommunications Provider |
Verizon |
| Broadband Speed Level |
NA
|
|
| Interstate / Distance |
I-85,I-95, /
60.0 miles |
| 4-Lane arterial Highway / Distance |
US 360 /
0.0 miles |
| Commercial Airport / Distance |
Richmond International Airport /
70.0 miles |
| General Aviation Airport / Distance |
Farmville Regional Airport /
25.0 miles |
| Rail Provider |
Virginia Southern Railway |
|
|
Total Population:
|
223,729 |
Total Labor Force:
|
103,685 |
|
Unemployment Rate:
|
9.90% |
Prevailing Wage-Hour/Annual:
|
$12.96/
$26,954 |
|
| Port of Richmond |
1 hour 23 minutes /
73.5 miles
|
| Port of Virginia (Portsmouth Marine Terminal) |
2 hour 40 minutes /
144.4 miles
|
| APM Terminal - Portsmouth |
2 hour 40 minutes /
146.1 miles
|
| Port of Virginia (Newport News Marine Terminals) |
2 hour 31 minutes /
153.1 miles
|
| Port of Virginia (Inland Port Front Royal) |
3 hour 15 minutes /
162.7 miles
|
| Port of Virginia (Norfolk International Terminals) |
2 hour 41 minutes /
162.8 miles
|
|
| Richmond-Petersburg |
1 hour 31 minutes /
83.9 miles
|
| Port of Washington - Dulles |
3 hour 12 minutes /
184.6 miles
|
|
| Short-line rail connects with Norfolk Southern. |
| Lot #2 (36 acres) has a 10 acre graded pad, designed for up to 150,000 sf. |
| Southside Electric Cooperative also serves the site from 3 substations. Southside Electric Coop plans to install a substation within the park. |
| Telecom fiber plans: Terminate fiber in new node. |
| The park is a node on the Mid-Atlantic Broadband Cooperative network. |
|
| * Population (2009) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Jul 2010) are based on the locality plus the extended labor market area. Prevailing wage is 4th quarter 2009 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality. |
|
|
|
This information has been secured from sources we believe to be reliable, but we
make no representation or warranties, expressed or implied, as to the accuracy