Skip Navigation Links
WHY
VIRGINIA
EXPAND A
BUSINESS
LOCATE A
BUSINESS
START A SMALL
BUSINESS
BUSINESS
SECTORS
INTERNATIONAL

SITE
SELECTION
COMMUNITY
PROFILES
RESOURCE
CENTER
ABOUT
US


 Back to Search Results << 1 of 1 >>

Constitutional Oaks Business Park 
VA 667 at US 58
Rose Hill, VA 24281
Driving Directions
This property is located in an Enterprise Zone.
Contact:
John Loftus
Virginia Economic Development Partnership
804-545-5786
jloftus@yesvirginia.org

Property Map Photos/Files   Additional Research
Community Profile:  Lee| Virginia's e-Region |

Site Specifications
Site Area (acres) 289.00 Largest Contiguous Parcel (acres) 210.00
Subdividable Yes
Zoning M2
Topography Gently rolling
Enterprise Zone Yes
Hub Zone Yes
Right Now Certified (Shovel Ready) Yes

Utilities
Electric Provider Powell Valley Electric Cooperative
Natural Gas Provider Seminole Gas
Water Provider Lee County Public Service Authority
Sewer Provider Lee County Public Service Authority
Telecommunications Provider Verizon
Broadband Speed Level NA

Transportation
Interstate / Distance I-75, / 65.0 miles
4-Lane arterial Highway / Distance U.S.Route 58 / 0.0 miles
Commercial Airport / Distance McGhee Tyson Airport / 65.0 miles
General Aviation Airport / Distance Lee County Airport / 10.0 miles
Rail Provider NA

Labor Statistics *
Total Population: 358,647 Total Labor Force: 149,565
Unemployment Rate: 10.08% Prevailing Wage-Hour/Annual: $14.69/ $30,565

Seaport Info
Port of Virginia (Inland Port Front Royal) 5 hour 53 minutes / 388.1 miles
Port of Richmond 6 hour 14 minutes / 410.5 miles
Port of Virginia (Newport News Marine Terminals) 437 minutes / 484.3 miles
Port of Virginia (Norfolk International Terminals) 446 minutes / 494.0 miles
APM Terminal - Portsmouth 450 minutes / 496.8 miles
Port of Virginia (Portsmouth Marine Terminal) 453 minutes / 499.5 miles

Other Port of Entry Info
Tri Cities 1 hour 24 minutes / 75.4 miles
Port of Washington - Dulles 6 hour 50 minutes / 440.2 miles

Comments
Dual power providers
25 miles from CSX rail siding.
Medical device manufacturer near Industrial Park
Fiber Optic Lines onsite/GIG Ethernet (multiple 10 Gbps)
4- Lane Highway US 58 easy access to I-40, I-75, and I-81 for service to 75% of the Nation's population
400,000 gallon water storage tank on site. Outside storage permitted with screening/fencing.
3 sites are graded for building pads: a) 50,000 sq. ft.; a) 100,000 sq. ft.; c) 50,000 sq. ft. The 3 sites can be combined to accomodate a 200,000 sq. ft. building.
60,000 s.f. shell building available on 10 acre site.
Site fed by dual substations with 5MW (redundant power)
Industrial Park is in close proximity to Tri State Employment (Kentucky, Tennessee, and Virginia)
205 additional acres available adjacent to industrial park, that could be used for business or research and development


* Population (2009) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Jul 2010) are based on the locality plus the extended labor market area. Prevailing wage is 4th quarter 2009 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality.

This information has been secured from sources we believe to be reliable, but we make no representation or warranties, expressed or implied, as to the accuracy of the information.

 Back to Search Results << 1 of 1 >>