|
|
|
|
| Total Area (sq. ft.) |
354,457 |
Total Available Area (sq. ft.) |
354,457 |
| Expandable To (sq. ft.) |
NA
|
Incremental Space (sq. ft.) |
NA
|
| Multi-tenant |
No
|
| Ceiling Height Center (ft.) |
28 |
Ceiling Height Eaves (ft.) |
16 |
| Site Area (acres) |
361 |
Zoning |
M-2, Manufacturing |
| Construction Year |
1948 |
LEED Certified |
No
|
| Construction Type |
Masonry |
|
| Electric Provider |
Dominion Virginia Power |
| Natural Gas Provider |
Columbia Gas of Virginia |
| Water Provider |
Town of Brookneal |
| Sewer Provider |
On site treatment plant |
| Telecommunications Provider |
CenturyLink |
| Broadband Speed Level |
NA
|
|
| Interstate / Distance |
I-85, /
65.0 miles |
| 4-Lane arterial Highway / Distance |
Wards Road, U. S. Rt. 29 /
22.0 miles |
| Commercial Airport / Distance |
Lynchburg Regional Airport /
25.0 miles |
| General Aviation Airport / Distance |
Brookneal-Campbell County Airport /
6.0 miles |
| Rail Provider |
Norfolk Southern Railway Company |
|
|
Total Population:
|
430,452 |
Total Labor Force:
|
213,828 |
|
Unemployment Rate:
|
8.98% |
Prevailing Wage-Hour/Annual:
|
$15.06/
$31,332 |
|
| Port of Richmond |
1 hour 56 minutes /
107.7 miles
|
| Port of Virginia (Inland Port Front Royal) |
2 hour 59 minutes /
186.8 miles
|
| Port of Virginia (Portsmouth Marine Terminal) |
3 hour 19 minutes /
187.1 miles
|
| Port of Virginia (Newport News Marine Terminals) |
3 hour 4 minutes /
187.4 miles
|
| Port of Virginia (Norfolk International Terminals) |
3 hour 14 minutes /
197.1 miles
|
| APM Terminal - Portsmouth |
3 hour 17 minutes /
199.9 miles
|
|
| Raleigh-Durham |
2 hour 5 minutes /
95.9 miles
|
| Port of Washington - Dulles |
3 hour 30 minutes /
192.7 miles
|
|
| Facility has a water treatment facilty producing 1.3 MGD - non consumptive use. The Town of Brookneal provides potable water. |
| Environmental Site Assessment completed in 2003 |
| Building is expandable due to the acerage available but no engineering has been completed |
| Facility has a package treatment plant with a 1.3 MGD discharge permit |
| There is a 2 million gallon water storage tank on site that is utilized for process water and it feeds the fire supression system. The tank is designed to reserve 1/3 of the capacity for fire flow. |
| Facility had additions in 1956, 1966, 1978, and 1984. |
| The entire roof on structure has been replaced within the past 7 years |
|
| * Population (2009) is based on the locality plus the extended labor market area. Labor force and unemployment rate (Jul 2010) are based on the locality plus the extended labor market area. Prevailing wage is 4th quarter 2009 locality data. The extended labor market area is defined as the localities located within 25 miles of the border of the base locality. |
|
|
|
This information has been secured from sources we believe to be reliable, but we
make no representation or warranties, expressed or implied, as to the accuracy
of the information.
|